Puma have an expertise in the full installation of all
types of generating sets. Above you see a 2500 kVA MTU powered
unit generating at 11000 volts being lifted onto the roof of
100 London wall (Albangate) in London. This generating set joined
two existing machines in a fully automatic synchronising and
load sharing system. Puma were responsible for the full
project management of the installation including liason with
the main contractor and local authorities.
|